Mostrar el registro sencillo del ítem

dc.contributor.advisorCotrina Teatino, Marco A.es_PE
dc.contributor.authorHonorio Ramos, Abeles_PE
dc.date.accessioned2021-05-31T09:06:49Z
dc.date.available2021-05-31T09:06:49Z
dc.date.issued2021-05
dc.identifier.urihttp://dspace.unitru.edu.pe/handle/UNITRU/16879
dc.description.abstractEl objetivo principal de la presente investigación es determinar la factibilidad de la ampliación del botadero para garantizar la continuidad de la operación, la seguridad del personal, equipos y comunidad cercana, a la vez cumplir el plan programado (TM/año), sin afectar su estabilidad física del botadero de la empresa minera Summa Gold Corporation. La metodología a seguir consiste en analizar factores geotécnicos, hidrológicos y de sismicidad, las muestras recogidas en campo fueron enviadas al laboratorio para su correspondiente proceso, luego se realizó el análisis de estabilidad de taludes estático y pseudo-estático con el software slide v9, considerando criterios como: Factor de seguridad mínimo estático a largo plazo = 1.5, Factor de seguridad pseudo-estático a largo plazo y para taludes permanentes = 1; además se realizó el análisis en las condiciones más críticas, en las secciones de mayor altura de apilamiento y mayor pendiente. También se ha considerado la existencia de superficies de falla circular, a través de apilamiento de desmonte y del suelo de fundación. El estudio presenta un diseño descriptivo y aplicada según su finalidad, la variable dependiente es ampliacion del botadero y la variable independiente es estabilidad de taludes. De acuerdo con los análisis realizados de la estabilidad estática y pseudoestática, cumplen con los criterios de análisis por el método de equilibrio límite. Se tiene factores de seguridad de 1.78 y 1.75 en el análisis estático, 1.12 y 1.24 en el análisis pseudo-estática. Por tanto, es factible la construcción del botadero en términos de estabilidad física, que permite la continuidad de las operaciones mina.es_PE
dc.description.abstractThe main objective of this research is to determine the feasibility of expanding the dump to guarantee the continuity of the operation, the safety of personnel, equipment and the nearby community, while complying with the programmed plan (MT / year), without affecting its physical stability of the dump of the mining company Summa Gold Corporation. The methodology to be followed consists of analyzing geotécnica, hydrological and seismic factors, the samples collected in the field were sent to the laboratory for their corresponding process, then the static and pseudo-static slope stability analysis was carried out with the software. slide v9, considering criteria such as: Minimum long-term static safety factor = 1.5, long-term pseudo-static safety factor and for permanent slopes = 1; Furthermore, the analysis was carried out under the most critical conditions, in the sections with the highest stacking height and the steepest slope. The existence of circular fault surfaces has also been considered, through the piling of cuttings and the foundation soil. The study presents a descriptive design and applied according to its purpose, the dependent variable is extension of the dump and the independent variable is slope stability. According to the static and pseudo-static stability analyzes performed, they meet the analysis criteria by the limit equilibrium method. There are safety factors of 1.78 and 1.75 in the static analysis, 1.12 and 1.24 in the pseudo-static analysis. Therefore, the construction of the dump is feasible in terms of physical stability, which allows the continuity of mine operations.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.subjectanálisis de estabilidad de taludeses_PE
dc.title‘Factibilidad para la ampliación del botadero mediante el análisis de estabilidad de taludes en mina Summa Gold Corporationes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.nameIngeniería de Minases_PE
thesis.degree.disciplineIngeniería de minases_PE
thesis.degree.grantorUniversidad Nacional de Trujillo, Escuela Ingeniería de Minases_PE
dc.type.versioninfo:eu-repo/semantics/acceptedVersiones_PE
dc.publisher.countryPEes_PE
renati.advisor.dni41872247
renati.advisor.orcidhttps://orcid.org/0000-0003-3801-0370es_PE
renati.author.dni72006595
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales_PE
renati.discipline724026es_PE
renati.jurorSICCHA RUIZ, Orlando Alexes_PE
renati.jurorGamarra Reyes, Filomeno Bilmeres_PE
renati.jurorCotrina Teatino, Marco Antonioes_PE
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.00.00es_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Universidad Nacional de Trujillo

Av. Juan Pablo II S/N Urb. San Andrés Trujillo – La Libertad, Perú | Telf. (044) 209020

Todos los contenidos de dspace.unitru.edu.pe están bajo la Licencia Creative Commons

repositorio@unitru.edu.pe / wlopez@unitru.edu.pe