Cambio de explosivo de Dinamita a Emulsión para reducir costos de voladura en ECM ALFA de Minera Aurífera Retamas S.A.

dc.contributor.advisorPedro Crisólogo, Prado Palomino
dc.contributor.authorFabian Gutierrez, Kevin Robin
dc.date.accessioned2024-11-03T02:34:13Z
dc.date.available2024-11-03T02:34:13Z
dc.date.issued2024-11
dc.description.abstractEl presente trabajo de investigación tiene como finalidad, analizar los costos en perforación y voladura con el uso de ambos explosivos, y así poder determinar el más rentable y eficiente, permitiendo incrementar la rentabilidad en la ECM M ALFA, contratista minera que brinda servicios en Minera Aurífera Retamas S.A. La metodología que se utilizó la investigación es de diseño cuasi experimental, descriptivo de tipo aplicativo. La población estuvo conformada por todas las labores del nivel 2920 de la Minera Aurífera Retamas y la muestra se conformó por las labores de desarrollo de ECM ALFA, como galería, para la recolección de datos utilizó el análisis documental. Las deficiencias de voladura según datos de la empresa son de una probabilidad menor al 91%, con un factor de carga explosiva de 18.23kg/m. Los resultados obtenidos nos permitieron identificar el consumo excesivo y los altos costos de los explosivos. Con esta nueva propuesta se obtuvo buenos resultados donde su eficiencia fue sobre el 96. % obteniendo 2.2 metros de avance por disparo, así como un factor de carga de 15.02 kg/m. Además, se comparó el costo unitario de perforación y voladura, donde se obtuvieron los costos con malla anterior, el cual fue de S/. 1833.48, este costo equivale a un avance de 2.12m/disp. y el costo por metro de avance corresponde a S/.866.48. Luego tenemos los resultados de la rentabilidad del uso del explosivo emulnor con el cual se obtuvo un costo total de S/. 1406.41, con un avance de 2.2m/disp., y el costo por metro de avance fue de S/.639.27. Se obtuvo los resultados del 8% con la diferencia de 92% de personal capacitado. los resultados fueron un éxito y la propuesta es viable para mejorar la operación con el uso del explosivo Emulnor. PALABRAS CLAVES: Costos unitarios, rendimiento, rentabilidad. Capacitación, perforación, voladura ABSTRACT The purpose of this research work is to analyze the costs of drilling and blasting with the use of both explosives, and thus be able to determine the most profitable and efficient one, allowing to increase profitability in the ECM M ALFA, a mining contractor that provides services in Mining. Aurifera Retamas S.A. The methodology used in the research is a quasi-experimental, descriptive, applicationtype design. The population was made up of all the work of level 2920 of the Retamas Gold Mining and the sample was made up of the development work of ECM ALFA, as a gallery, for data collection it used documentary analysis. According to company data, blasting deficiencies have a probability of less than 91 %, with an explosive load factor of 18.23kg/m. The results obtained allowed us to identify the excessive consumption and high costs of explosives. With this new proposal, good results were obtained where its efficiency was over 96. %, obtaining 2.2 meters of advance per shot, as well as a load factor of 15.02kg/m. In addition, the unit cost of drilling and blasting was compared, where the costs with previous mesh were obtained, which was S/. 1833.48, this cost is equivalent to an advance of 2.12 m/disp. and the cost per meter of advance corresponds to S/.866.48. Then we have the results of the profitability of the use of the explosive emulnor with which a total cost of S/. 1406.41, with a progress of 2.2m/disp., and the cost per meter of progress was S/.639.27. The results of 8% were obtained with the difference of 92% of trained personnel. The results were a success and the proposal is viable to improve the operation with the use of the Emulnor explosive. KEY WORDS: Unit costs, performance, profitability. Training, drilling, blasting
dc.formatapplication/pdf
dc.identifier.urihttps://hdl.handle.net/20.500.14414/22755
dc.language.isospa
dc.publisherUniversidad Nacional de Trujillo
dc.publisher.countryPE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.subjectTECHNOLOGY::Civil engineering and architecture::Geoengineering and mining engineering::Mining engineering
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05
dc.titleCambio de explosivo de Dinamita a Emulsión para reducir costos de voladura en ECM ALFA de Minera Aurífera Retamas S.A.
dc.typeinfo:eu-repo/semantics/bachelorThesis
dc.type.versioninfo:eu-repo/semantics/publishedVersion
renati.advisor.dni17874198
renati.advisor.orcid0000-0003-2913-9076
renati.author.dni76576948
renati.discipline724026
renati.jurorGamarra Reyes, Eilomeno Bilmer
renati.jurorSiccha Ruiz Orlando Alex
renati.jurorPadro Palomino, Pedro Crisólogo
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttps://purl.org/pe-repo/renati/type#tesis
thesis.degree.disciplineIngeniería de Minas
thesis.degree.grantorUniversidad Nacional de Trujillo
thesis.degree.nameIngeniero de Minas
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Fabian Gutierrez.pdf
Size:
4.92 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections