Rentabilidad de la estabilización aplicando pernos tensionados de adherencia mixta en tipo de roca III-B, rampa Fabi 3, mina Poderosa

dc.contributor.advisorPrado Palomino, Pedro Crisologo
dc.contributor.authorPolo Yupanqui, Erwin Alexis
dc.date.accessioned2024-07-08T14:54:20Z
dc.date.available2024-07-08T14:54:20Z
dc.date.issued2024-07
dc.description.abstractEl objetivo de la presente investigación es determinar la rentabilidad de la estabilización aplicando pernos tensionados de adherencia mixta en tipo de roca III-B, rampa Fabi 3, mina Poderosa; mediante la mecanización, técnicas y monitoreo antes, durante y después de cada actividad en el ciclo de minado. La investigación que se ha desarrollado es de tipo aplicada – descriptiva. La población estuvo conformada por 363 pernos tensionados de adherencia mixta en tipo de roca III – B, mina Poderosa, y como muestra se tiene 78 pernos tensionados de adherencia mixta en tipo de roca III – B, rampa Fabi 3, mina Poderosa. Los resultados obtenidos fueron que aumentó la rentabilidad de la empresa en un 28.14%, pasando de US$ 270.75/m lineal a US$ 346.95/m lineal, con la reducción de los descuentos y penalidades en un 100% en estabilización por pernos no tensionados y con deficiente capacidad de carga a falta de un torque óptimo, así como la mejora en un 56.7% en el cumplimento al programa mensual de avance, gracias al incremento del rendimiento en avance por perforaciones de 8 pies, obteniendo mejoras en las valorizaciones mensuales por cada actividad. Llegándose a la conclusión que la implementación de la mecanización, técnicas y monitoreo en las actividades del ciclo de minado es beneficioso para la empresa ya que disminuye las pérdidas económicas y tiempos de ejecución; e incrementa la rentabilidad y el rendimiento en las operaciones de estabilización y avance.
dc.description.abstractThe objective of this research is to determine the profitability of stabilization by applying tensioned bolts with mixed adhesion in rock type III-B, Fabi 3 ramp, Poderosa mine; through mechanization, techniques and monitoring before, during and after each activity in the mining cycle. The research that has been developed is of an applied-descriptive type. The population was made up of 363 tensioned bolts of mixed adhesion in rock type III – B, Poderosa mine, and as a sample there are 78 tensioned bolts of mixed adhesion in rock type III – B, Fabi 3 ramp, Poderosa mine. The results obtained were that the company's profitability increased by 28.14%, going from US$ 270.75/linear m to US$ 346.95/linear m, with the reduction of discounts and penalties by 100% in stabilization for non-tensioned bolts. and with poor load capacity due to lack of optimal torque, as well as the improvement of 56.7% in compliance with the monthly advancement program, thanks to the increase in advance performance through 8-foot drilling, obtaining improvements in the monthly valuations per each activity. Reaching the conclusion that the implementation of mechanization, techniques and monitoring in the activities of the mining cycle is beneficial for the company since it reduces economic losses and execution times; and increases profitability and performance in stabilization and advancement operations.
dc.formatapplication/pdf
dc.identifier.urihttps://hdl.handle.net/20.500.14414/21675
dc.language.isospa
dc.publisherUniversidad Nacional de Trujillo
dc.publisher.countryPE
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectTECHNOLOGY::Civil engineering and architecture::Geoengineering and mining engineering::Mining engineering
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#1.00.00
dc.titleRentabilidad de la estabilización aplicando pernos tensionados de adherencia mixta en tipo de roca III-B, rampa Fabi 3, mina Poderosa
dc.typeinfo:eu-repo/semantics/bachelorThesis
dc.type.versioninfo:eu-repo/semantics/publishedVersion
renati.advisor.dni17874198
renati.advisor.orcid0000-0001-8095-3976
renati.author.dni76649339
renati.discipline724026
renati.jurorQuispe Araujo, Eusebio Antonio
renati.jurorGago Porras, Oliver Humberto
renati.jurorPrado Palomino, Pedro Crisologo
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesional
renati.typehttp://purl.org/pe-repo/renati/type#tesis
thesis.degree.disciplineIngenieria de Minas
thesis.degree.grantorUniversidad Nacional de Trujillo, Escuela de Ingenieria de Minas
thesis.degree.nameIngeniero de Mnas
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Polo Yupanqui.pdf
Size:
7.32 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections